VCS Projects



offshore experience & marquee projects

Offshore Experience

Third Party Inspection-Offshore Projects

PROCESS PLATFORMS
MHN PROCESS PLATFORM AND LIVING QUARTERS AND OF MHN-PROCESS GAS COMPRESSOR PROJECT-8 LEGGED JACKET, 4 LEGGED JACKET AND 2 TRIPODS AND 3 NOS. GAS TURBINE DRIVEN PROCESS GAS COMPRESSOR MODULES OF 2.3 MMSCMD CAPACITY EACH
B193 PROCESS PLATFORM PROJECT comprising of Well cum process platform, Living Quarter Platform, HP/LP Flares and LLP Flare and Connecting Bridge. The Platform is of 8 legged jacket with cellar deck and main deck. The Living quarter platform is a four legged jacket platform with cellar deck and LQ building module & switch gear/TG building mounted on main deck and helipad located on top of LQ module
WELL HEAD PLATFORMS
RS 5 WELL PLATFORM PROJECT comprising of 5 Nos. New Well Platforms, 60 Kms of Well Fluid Line, 41 Kms of Crude Line, 38 Kms of Water Injection Lines, 63 Kms of Composite Power Cable, Associated top side modifications.
MHSRD-III PROJECT comprising of 3 nos. Well Head Platforms, Clamp-on Structure (3 wells), 15 segment (~125.6 km.) including well fluid, gas lift, water injection, S1 Sand and oil pipe lines, Modifications on 18 nos. well/ process platforms, Laying of 1.5 MW, 11 kVA, 7.5 km, sub-sea power cable etc
SUB-SEA PIPELINES
SUB-SEA PIPELINE REPLACEMENT PROJECT V comprising of 25 segments of subsea pipelines of total length 114.83 Km, 11nos. of umbilical of total length 57.91 Km for connecting subsea wells to respective host platforms, Topside modification at25 nos. of platforms, Demolition of 14 nos. of redundant risers.

Our International Projects